LogoPulse
Now Live on 340+ Plant Floors

Your Entire
Shop Floor.
One Tap Away.

Real-time work orders, downtime tracking, and OEE dashboards pushed to ruggedized phones and tablets — no fixed terminal required.

BG
MR
TK
SL

340+ plant managers cut clipboard time by 91%

LIVE
Line 4 — Feb 24
87.3OEE %
A94.1%
P92.8%
Q99.9%
Work Orders3 Active
WO-4812
68%
Bracket Assy A3
WO-4813
NEXT
Shaft Collar B7
WO-4814
NEXT
Housing Cap C2
Line 1
Line 2
Line 3
Line 4
Line 5
Throughput
+12.4%
Downtime Today
4m 12s
↓ 63% vs last week
Alert Resolved
Line 3 back online
Scroll to explore
Real-Time OEE📱Mobile-First MES🔧Downtime Tracking📋Work Order Queue📊Cycle-Time Analytics🔔Instant Alerts🔗ERP Integration🏭Multi-Line Dashboard
01 / Track

Every Work Order,
Exactly Where It Stands.

WO-4812Running
Line 4
Bracket Assembly A3
Weld Station 2
163 / 240 pcs68%
WO-4813Complete
Line 1
Shaft Collar B7
CNC Mill 1
180 / 180 pcs100%
WO-4814Queued
Line 2
Housing Cap C2
Press Brake 3
0 / 320 pcs0%
WO-4815Running
Line 3
Pivot Pin D9
Lathe Cell A
412 / 500 pcs82%

Foremen see live work order status, operation progress, and part counts on any device — without leaving the floor or walking back to a terminal.

91%
Reduction in clipboard walks
4.2 min
Avg time to spot a production gap
340+
Plants running Pulse today
Real-time
Data latency on the floor
Works offline too
Data syncs the moment connectivity restores — no lost entries.
02 / Schedule

Drag. Drop. Done.
Priorities shift in seconds.

Production Schedule — Feb 24
RunningPlannedDowntime
06:00
08:00
10:00
12:00
14:00
16:00
Line 1
WO-4810
WO-4812
Line 2
WO-4811
WO-4813
Line 3
Changeover
WO-4814
Line 4
WO-4815
Line 5
WO-4816
WO-4817
NOW

Foremen drag work orders to reprioritize in real time. The schedule board syncs across every device on the floor — no phone calls, no whiteboard updates.

Live schedule sync
Every device on the floor sees changes within 2 seconds.
🔄
Changeover planning
Block changeover time and see its ripple effect instantly.
👆
Drag-to-prioritize
Touch-optimized for gloved hands on ruggedized tablets.

"We cut schedule re-planning time from 40 minutes to under 3. The foreman just drags the card."

Marcus Webb, Plant Manager — Acuity Fabrication, Detroit
03 / Alert

Downtime fires an alert.
You're already moving.

🔴
Unplanned DowntimeLine 3

Press brake fault — cycle stopped. Est. impact: 18 parts.

14:22:07R. Nakamura
Resolved
🟡
Cycle Time DeviationLine 1

Avg cycle 4.8s vs target 4.2s for last 12 units.

14:24:51T. Okonkwo
🔵
WO-4813 CompleteLine 2

Shaft Collar B7 — 180/180 pcs. Ready for next order.

14:31:14System
🟡
OEE Below ThresholdLine 5

Performance dropped to 71.2% — below 80% target.

14:38:02D. Alvarez

Pulse watches every cycle. The moment a line goes dark, a cycle blows its window, or OEE drops below your threshold — the right person gets an alert on their phone before they've left their workstation.

Escalation Chain
1
Machine Operator0s
2
Shift Supervisor+2 min
3
Plant Manager+8 min
4
Ops Director+20 min
< 8s
Alert delivery time
73%
Faster MTTR vs email/radio
04 / Analyze

OEE data without
walking back to a terminal.

OEE Trend — 6 Weeks
+16.2 pts
Latest
87.3%
W1
W2
W3
W4
W5
W6
Current APQ Breakdown
Availability
94.1%
Performance
92.8%
Quality
99.9%

CI engineers get cycle-time data, shift-level OEE, and downtime Pareto charts pushed to their phones — no walk to the fixed terminal, no waiting for the morning report.

Cycle Time — Line 4
4.0s
↓ 16.7% vs 30-day avg
Target: 4.2s
Target 4.2s
"

"Before Pulse, I had to walk to the SCADA terminal every time I wanted OEE data. Now I check it while I'm still at the cell. We hit our best OEE quarter ever — 86.4% — three months after go-live."

SL
Sandra Lee
CI Engineer — Meridian Precision, Cincinnati
05 / Integrate

Connects to what
you already run.

SA
SAP
ERP
OR
Oracle
ERP
IN
Infor
ERP
IQ
IQMS
MES
EP
Epicor
ERP
MA
Maximo
CMMS
FI
Fiix
CMMS
IG
Ignition
SCADA
WO
Wonderware
SCADA
TU
Tulip
MES
TA
Tableau
BI
PO
Power BI
BI

+ REST API & Webhook for anything else

Pulse reads from your existing ERP, CMMS, and SCADA systems. No rip-and-replace. Median time from contract to first work order on a foreman's phone: 11 days.

🔌
Pre-built ERP connectors
SAP, Oracle, Infor, Epicor — live in days, not months.
🔒
SOC 2 Type II certified
Your production data never leaves your firewall perimeter.
📱
BYOD or ruggedized
Works on any Android/iOS device. Tested on Zebra & Panasonic Toughbook.
Free Resource

Download the Plant ROI Calculator

Enter your shift count and downtime hours. See your annual savings from digitizing shop-floor data collection.

Get the spreadsheet